Contact Us

Interested in the LOBO System? Get in touch

Bilfinger Salamis LOBO Report 20 May 2016

Bilfinger Salamis report on LOBO

This is a brief report for the advantages and disadvantages of LOBO System scaffold from the site visit that was carried out on the 31/03/16. After our visit on the 31st March where we met Paul Timson at LOBO and after reviewing the demonstration and the brochures I feel the finding are as follows.

Introduction:

LOBO scaffold; is flexible and a safe alternative to platforms and scaffolding that anyone can assemble and use.

Most businesses are likely to require platforms and scaffolding at some stage. However, if you’re hiring this equipment on a regular basis, it will soon become a significant annual expense. Furthermore, such equipment usually requires specialist help to assemble, particularly if customised designs are needed for one-off projects. 

 Valero Oil Refinery

 

Costs – Purchase & Training:

 

1.8 Platform Kit for: £5,592.89

 

 

 

LOBO Towerstore Units

 LOBO Systems Towerstores

4512 (Small):                           £1,746.00

4518 and 4524 (Medium):            £1,870.80 

4530 and 6036 (Large):               £1,995.60

 

Training Course

Train the Trainer Course , maximum 3 delegates £1740-00

 

 

 

 

 


"LOBO Scaffold takes half the time as compared to the  cost of conventional scaffolding"

Availability to train a trainer course. This gives the opportunity for the individuals to train all trades with the business to use the LOBO System.

All Trades can use the LOBO System once trained.

Light weight which benefits manual handling issues when erecting and dismantling

Reduced man hours when erecting and dismantling the LOBO System compared to conventional scaffold

Can be used in a variety of situations

Good storage facility which enables all components to be stored together and is easily transportable due to the built in wheels

No tools required for erecting and dismantling

Tried and tested within petrochemical and aviation industry.